Richmond Heights Invites the Natural World In

Richmond Heights Invites the Natural World In
Richmond Heights invites the natural world in by opening a new Innovation Station and renovated courtyard at its elementary school. A special Back-to-School event hosted by the school district invited community members, students, and parents to experience learning spaces that feature colorful, organic design elements, including stones, trees, and gardens. Incorporating modern technology with a nature theme promotes student curiosity about the world around them.

Richmond Heights Invites the Natural World In

At a Back-to-School event on August 8, Richmond Heights Local Schools officially opened their new Innovation Station and courtyard renovation at the district’s elementary school. The $1.4 million project features a 2,320 SF renovation that reclaims an unused courtyard, storage room, and underused library, transforming them into an innovative makerspace, meeting area, and outdoor learning courtyard. Phase Two of this project is scheduled to be opened in the Fall of 2024 and includes a new PreK-K Playground, Safety Town, playground for grades 1-6 with a half-size basketball court and butterfly garden.

Drawing on the symbolism of houses, trees, and gardens, the Innovation Station features natural colors, a free-standing custom-built tree, cabinetry that mimics a community of homes, glass with organic plant-shaped screening, and a garden courtyard. Natural light floods interior spaces through glass walls, promoting views of the courtyard.

The natural world is blended with technology and encourages students to explore both worlds in a hands-on way.

"Now we have an area that enables our students to imagine, learn, grow, and explore. I love how this space does just that."
Dr. Marnisha Brown
Superintendent

Richmond Heights Invites the Natural World In

Back-to-School Extravaganza

The Back-to-School event was attended by hundreds of community members, including students, parents, and district staff, along with Superintendent Dr. Marnisha Brown, members of the Board of Education, and city officials. They officially cut the project’s ribbon, opened the community’s new spaces, and encouraged participants to plant vegetables and herbs in the courtyard and visit the Innovation Station and makerspace.

At the ribbon cutting, Dr. Brown reflected on the opportunities for students in the new Innovation Station and courtyard. “I am very excited about the possibilities for our younger students. Our elementary school staff has been working very hard to find innovative ways to engage students. These new spaces do just that.”

The previous courtyard in the elementary school was mostly unused but has now been transformed into an environment that can be used all year. Students can explore gardening, composting, and tending a butterfly garden. These unique spaces are activated by students who can connect with nature in a community located near the city of Cleveland.

"The district didn't want another traditional library full of books. They wanted an innovative space that encouraged creativity. We wanted to bring the outdoors in."
Zora Pavlovic
ThenDesign Architecture

Outdoor Spaces for Outdoor Learning

One Vision. One Mission. One Richmond.

Project Manager Zora Pavlovic used nature as a theme to connect the Innovation Station with the courtyard. “We designed this custom tree element to create a sense of protection, peace, happiness, and friendship. We also created a movable glass wall that allows students to access the courtyard directly from the Innovation Station.”

3D printers, Cricut machines, advanced computers, and a Lego wall are located in the makerspace, while creative and flexible furniture in the Innovation Station simultaneously accommodates up to two classes. “It’s not just about learning through lectures. It’s about creating with your hands, whether with nature or technology,” commented Zora.

For Dr. Brown, this newly renovated space will foster a love of learning and encourage continued community support for the district.

“Our mantra is ‘One Vision. One Mission. One Richmond.’ Richmond Heights is a small community, and we have no choice but to be united. By opening this new space today, it allows for students, parents, and everyone to be a part of it. The community understands that investing in our students and education will only benefit the community in the future—it’s one Richmond Heights.”

Richmond Heights Ribbon Cutting Ceremony

Perry LSD Hosts Opening Ceremonies for Three Elementary Schools

Perry LSD Hosts Opening Ceremonies for Three Elementary Schools
The community in Perry Township and surrounding areas enjoyed a celebratory milestone as the Perry Local School District officially opened its new elementary schools with three ribbon cutting ceremonies and three open houses on the same day. Watson Elementary, Southway Elementary, and Lohr Elementary students toured the completed educational facilities with their families and local community members. The opening ceremonies for three elementary schools had attendance in the hundreds at each event. Guests were invited to walk the hallways just before the opening of the 2024-2025 school year.

Perry Local School District Hosts Opening Ceremonies for Three Elementary Schools

The Perry Local School District enjoyed a unique occasion as they hosted ribbon cutting ceremonies and open houses for their three new elementary schools on the same day. Construction and the final touches were completed at Watson Elementary, Southway Elementary, and Lohr Elementary to kick off the 2024-2025 school year.

Braving the summer heat, attendance at each event was in the hundreds as parents, students, and community members celebrated the conclusion of the monumental project. After Superintendent Nate Stutz and Board of Education President Doug Brown gave thankful remarks, the traditional ribbon was cut, and the doors were officially opened for the community to tour the schools.

"Beyond the schools being new academic spaces, they represent moving forward as a community and a district."
Nate Stutz
Superintendent

Perry Local Schools Opening Ceremonies for Three Elementary Schools

Respect for the Local Culture

The Perry community approved a bond levy in early 2020 to secure funds to update its educational facilities. This allowed the district to secure additional funds from the state through the Ohio Facilities Construction Commission (OFCC), which agreed to provide additional funding for the project.

To best serve the members of their district, the most feasible plan was to fund and build the three schools simultaneously. Though each school is reminiscent of the other, they all have distinct personalities and themes to emulate the local culture. While Southway Elementary features an industry and railroad motif, Watson Elementary has a design concept of the arts, and Lohr Elementary highlights agriculture.

Katherine Mitchell, RA of ThenDesign Architecture, worked on the project and noted how consistent elements throughout each school supported their unique character, “Each theme informed every aspect of the design, from the exterior façade to color palettes and patterns on the floors. We wanted the space to be exciting and inspiring for the students.”

Superintendent Nate Stutz commented on the attention to detail that went into each school, “I was very impressed with the thought that went into the detailed work associated with the theme concepts.”

"Seeing everyone's enjoyment coming to life reminds me why I became an architect: to give back to the community."
Katherine Mitchell, RA
ThenDesign Architecture

Three Open Ceremonies in the Same Day

A Thankful District and an Excited Community

The crowded hallways of each school indicated the community’s passion for their schools. The buildings were filled with smiling faces, warm hugs, and happy children as excited students got to preview their new classrooms. Parents chatted with teachers despite the loud, celebratory atmosphere. By all standards, the three opening ceremonies were a resounding success.

“Our pledge to the community,” noted Superintendent Stutz, “is to continue to provide the absolute best education that we can for the children of this district.”

School Board President Doug Brown is a Perry High School graduate and lifetime resident. He expressed gratitude to the Perry community, “Today doesn’t happen without all of you. On behalf of your school board, thank you for your continued support of our district and our kids. We are and always will be Perry.”

Watson, Southway, and Lohr Elementary students are experiencing new academic opportunities due to the tireless efforts and unwavering support of many in the school district and community. These three new educational facilities will serve the next generations of Perry students.

"Today doesn't happen without the vision to move our district forward."
Doug Brown
President, Board of Education

Three Ribbon Cutting Ceremonies

The day before the open houses inaugurated the three new elementary schools, the Perry Local School District commissioned a special walkthrough granting four students a sneak-peek tour of one of the new state-of-the-art facilities.

Read this article and watch the video to learn what they had to say.

Perry LSD’s Southway Elementary Student Walkthrough

Perry LSD's Southway Elementary Student Walkthrough
Four elementary school students in the Perry Local School District toured the newly completed Southway Elementary School shortly before it opened for the 2024-2025 school year. While staff and teachers were still wrapping up their final preparations for the grand opening, during the Southway Elementary Student Walkthrough, the students visited numerous areas to give their initial impressions of the finished building.

Perry Local School District's Southway Elementary Student Walkthrough

Southway Elementary is one of three new schools opening this year in the Perry Local School District. Sixth graders Cami and Veda, fifth grader Ryder, and third grader Elley were invited to explore the building and react to discovering the new spaces while having fun along the way. As staff and teachers put the final touches on their areas before the grand opening, the students visited areas that included student dining, the media center, the music room, the gymnasium, an art room, and the playground.

"For people who like a lot of colors, it will be good for them."
Elley
Third Grade Student

Perry Local School District's Southway Elementary Student Walkthrough

A School With A Theme

Veda and Elley appreciated the vibrant colors throughout the building and recognized the consistent theme of industry and railroads. Train railroad track patterns line the hallway floors of the interior. Outside, patterns of cross bracings commonly found on bridges and large buildings adorn the red brick walls near the main entrance.

Access to sunlight increases student well-being and is found throughout the school, including the gymnasium. Abundant wood and natural light appealed to Ryder, “A bunch of windows in this school will help kids focus,” he said.

Southway Elementary Design Details

A School With A Theme

The Perry Community approved a bond levy in early 2020 to secure funds to update its educational facilities. This allowed the district to secure additional funds from the state through the Ohio Facilities Construction Commission (OFCC), which agreed to provide additional funding for the project.

Cami, Veda, Ryder, and Elley were the first students to traverse Southway Elementary before it opened. They spent the morning walking the hallways, visiting the classrooms, sitting in chairs, and enjoying the playground. Elley summed up the day, “It was a really good experience.”

While Southway Elementary featured an industry and railroad motif, Watson Elementary had a design concept of the arts, and Lohr Elementary focused on the theme of agriculture. All three elementary schools completed construction and opened for the 2024-2025 school year.

"I think they'll like the school because it's super big, and open, and different than other elementaries."
Cami
Sixth Grade Student

Students Tour Southway Elementary

Indian Valley Athletic Complex Competes for Excellence

Indian Valley Athletic Complex Competes for Excellence
The student-athletes of Indian Valley Local Schools used to travel to other facilities for competition finals, but since the Indian Valley Athletic Complex opened, the championship-class stadium has hosted cross country invitationals, track meets, playoff games, and the middle school state qualifiers. The field house serves as a year-round training facility that offers flexible configurations to support all manner of boys' and girls' sports.

Indian Valley Athletic Complex Competes for Excellence

Former elementary school principal Dr. Ira Wentworth had a vision for the Indian Valley Local Schools when he became the superintendent in 2013. The experienced runner sought to enhance the student learning experience while bolstering the local athletics program. Dr. Wentworth understood the importance of a robust athletics facility and how a state-of-the-art stadium with synthetic turf and an eight-lane track could make the Indian Valley Athletic Complex a competitive hotspot supporting students and exciting the local community.

Surrounded by rolling green hills and beside a cornfield in Gnadenhutten, Ohio, the new $7 million 3,000-seat stadium and 17,000 SF field house host large track meets, cross country invitationals, playoff games, and the middle school track and field Inter-Valley Conference championship.

The eight-lane polyurethane track surrounds the pole vault runway in addition to the football field. The Braves’ home stadium also provides for discus throwing, shot putting, the high jump, and the long jump, which can be expanded to accommodate the triple jump.

“You can watch all seventeen track and field events going,” said Superintendent Dr. Ira Wentworth. “It’s amazing to see it now, considering the former home field was near an old mine that created drainage problems. There was standing water in the endzone after it rained. But now, we host championship events. That is very rewarding.”

“We knew sports were really important to the local community,” said ThenDesign Architecture Project Manager Claire Bank, who shared a personal connection to the stadium project, “I’m also very passionate about running, so I understood the district’s desire for a fast competition track.” Design for the project was completed in the fall of 2019, with the first game in August 2020.

The stadium project was built by Beaver Constructors serving as the Construction Manager at Risk.

"I'm a track guy. So, laying out the field event locations at this complex is probably one of the most fun projects of my career."
Dr. Ira Wentworth
Superintendent

Indian Valley Athletic Complex Competes for Excellence

Flexible Spaces Year Round

Indian Valley Local Schools’ mission statement is: “Working together to personalize a rigorous standards-based learning experience.” The district’s principles are innovation, integrity, relationships, teamwork, and tradition. To honor a long-time community servant, a memorial Victory Bell for Indian Valley Board of Education Member “Uncle Larry” Holmes was installed in the D-zone facing the field house.

The field house serves as a year-round, multi-purpose building containing the concessions stand, ticket office, restrooms, weight room, and locker rooms. Movable sports netting maximizes the customization of the primary open area to accommodate inside baseball and softball practices.

In the adjoining space, an operable dividing wall provides further flexibility by opening into a single space or closing to have two. Lockers can be removed and stored in the nearby shed during winter so mats can be placed on the floor for wrestling season.

The same area is used for the girls’ track locker room in the spring. In the fall, it becomes the visiting football team’s locker room, creating a steady rotation of use from season to season.

The Indian Valley Field House Offers Flexible Spaces

A New Bond for a New Stadium

The planning for the Indian Valley Athletic Complex began in 2018 after Dr. Wentworth discovered that a $7 million district levy was scheduled to expire in 2019. He started an informational campaign proposing that a new $7 million bond to help construct the much-needed stadium could go into effect just as the 1995 bond ended. This would time the funding so that residents would not endure any increased financial impact.

“Once I heard the bond that built the new gymnasium at the high school was going to fall off the books, we got to work,” Dr. Wentworth said. “After the community understood their taxes were not going to increase, we received really excellent support.” He added, “It passed about 60% to 40%.”

Before design began, there was an effort to purchase the ideal land to build on, which would have the new athletics facility near Indian Valley High School. The owner of the neighboring manufacturing facility was approached and received the idea warmly, “He told the district he’d sell us whatever we needed,” recalled Dr. Wentworth. “Then, Claire worked her magic and designed a beautiful stadium complex.”

After the stadium opened, the parking lot was paved, a small storage building was built, and the two-bus garage was renovated. Community generosity and partnerships with local businesses have provided additional funding for the complex.

The New Stadium Hosts Championship Competitions

History Becomes Legacy

As part of the design process, a site survey of the 19-acre area was conducted before construction began, and the results were surprising. “There was some excitement,” Claire recalled the buzz this created for the school district. “During the archeological study, they found about 500 artifacts just during Phase One. We knew this was possible given the area, but what they found was pretty cool.”

Archeologists canvased the property, excavated, salvaged, and documented their findings, which included earth oven features, pottery, projectile points, stone tools, and modified flakes. The Columbus Dispatch covered the story on its website, and an informational display with graphics provided by Ohio Valley Archaeology Inc. (OVAI) greets visitors at the stadium’s main entrance. “We put the sign there with some interesting information so visitors could learn about the location’s historical significance,” Claire noted.

The geophysical survey and archaeology excavation processes were included in the construction timeline, and despite the historical findings, there was no scheduling impact on the project. Some of the items discovered are still on display at the school district building and available for instruction in the school’s local history class.

An Archeological Find

Bringing Communities Together

Before the Indian Valley Athletic Complex was built, their high school students had to travel ten miles for track and field practice. Full-field football practices were only available off-site. Now, students can safely and efficiently practice in the new stadium at their own high school.

The high-quality Indian Valley Athletic Complex is a much-desired host for many events. It was chosen as a neutral site for the OHSAA football playoff games and hosted a professional drum and bugle corps complimentary concert for the community. This unique experience allowed the marching band students to learn from experts, gaining an opportunity not possible before the stadium’s construction.

“The new stadium is a source of pride for the entire community, as evidenced by the compliments of our visiting competitors,” Dr. Wentworth said. “Athletics has always been a draw that brings our geographically diverse school district together, but the new complex has taken it to a new level.”

"The stadium has truly become an educational asset for our students."
Dr. Ira Wentworth
Superintendent

Lexington’s New 7-12 Facility Brings Two Schools Under One Roof

Lexington's New 7-12 Facility Brings Two Schools Under One Roof
Lexington Local Schools wanted to consolidate their junior high and high schools into a modern educational facility. Lexington's new 7-12 facility brings two schools under one roof with two academic wings, a performing arts center, three gymnasiums, collaborative media centers, centralized student dining, and an athletics complex.

Lexington's New 7-12 Facility Brings Two Schools Under One Roof

Lexington Local Schools opened their new 7-12 grade educational facility, combining Lexington Junior High and Lexington High School under a single roof. The new $56 million school building opened as scheduled on September 6 for the 2022-2023 school year.

The school district and local community began a journey to consolidate and improve their scholastic programs after passing a bond issue in 2018. After extensive educational planning, they started designs for the new 200,000 SF Lexington 7-12 school. The modernized structure hosts grades 7-12 divided into two academic wings, 7-8 and 9-12. This state-of-the-art facility incorporates various student-centered design principles, including open collaborative and flexible spaces, alongside more traditional academic and classroom areas.

Lexington Local Schools’ passion for the arts and sports prioritized the need for a 750-seat performing arts center, three gymnasiums, and an athletics complex that provides academic and extracurricular opportunities for its 1,200 students.

Lexington's New 7-12 Facility

History Looks Forward

With pride in its rich history in education, the Lexington, Ohio, community maintained its aging schools with a series of construction and renovation projects over the decades in an effort to preserve the buildings. The Lexington Junior High School was part of the oldest building in the district, built in the 1890s, with a bulk of it added on in 1930. That construction assimilated the forty-year-old school and became the history department.

The high school was built in the 1960s, and renovations to the junior high school in 1970 were the last significant improvements. The school district has since recognized the need to take action as the infrastructure continued to age. Showing great respect for Lexington’s heritage, relics from the oldest structure were salvaged to incorporate into notable spaces of the new 7-12 school.

During the planning process, the existing high school site was identified as the best location for the new school, requiring the district and design team to plan their spatial plans efficiently. Considering the new construction would be 30 feet away from the existing structure, safety became a paramount consideration. The project became a real-time lesson in architecture for the students to watch from their classroom windows.

Lexington's New 7-12 Facility Under Construction & Completed

Visioning and Collaboration

In November 2018, district voters approved an 8.6-mill bond issue for $55.95 million for construction costs associated with the project. Working with the Ohio Facilities Construction Commission through the Expedited Local Partnership Program (ELPP), the district would consolidate its five existing school buildings into two: a 7-12 school and a PreK-6 school. They began design for the 7-12 building first.

With funding secured, design began in earnest with educational visioning in 2019. The Lexington Local School District met with educators, community members, and local leaders to determine their educational priorities for their new facilities. While feedback came from various stakeholders, the district identified that following a “junior high school model” was a key priority.

This model organizes student education around curricular departments such as math, science, and English language arts. This contrasts with a “middle school model” where education is organized around small teams of educators from each core subject. Visioning combined with touring local schools allowed the administrators and designers to craft a layout that would suit the district’s educational needs.

Project Manager Scott Alleman commented, “It’s a traditional community, and they wanted to establish a forward-thinking model for education.” He continues, “They knew they didn’t simply want ‘double-loaded corridors,’ so we worked through various layouts. It became clear what strategies would work best.”

The timing of design completion in December 2022 coincided with the COVID-19 global pandemic. The last two phases, including Design Development (DD) and Guaranteed Maximum Price (GMP) / Construction Documents (CD), were finished during the early months of the global shutdown and were conducted almost 100% virtually.

Lexington's New 7-12 Facility Visioning Session & School in Use

Advancing Lexington's Arts and Athletics Programs

“The district was adamant that academics were the number one focus,” Scott recalled. “They pride themselves on athletics and the arts.”

In addition to the new 7-12 school building, Lexington Local Schools commissioned a $3 million athletics complex with baseball and softball fields, two practice soccer fields, a concession building, bleachers, press boxes, dugouts, mesh backstops, and scoreboards.

The enhanced ball fields are located at the base of a steep 15′ grade and anchored by a concessions and storage building centered between them, on an axis with the school. Each field features mesh backdrops, beautiful new scoreboards with field backstops, and fencing highlighted in the school’s purple and gold colors.

The ADA-accessible athletics complex offers a streamlined and engaging visitor experience. It is connected to the junior high school parking lot via a stairway and processional ramp, providing breathtaking field views. These “collegiate-level” fields visible from the junior high school’s second floor provide added athletic opportunities to the school’s sports program.

During the educational visioning session, many in the community voiced enthusiastic support for Lexington’s arts and athletics programs. Lexington’s 7-12 school features three expanded gymnasiums: a high school competition gym, an auxiliary gym, and a junior high school gym. The competition gym has a seating capacity of 2,400 and a mezzanine that can be used for wrestling practices and other activities.

The crown jewel of the 7-12 school is the 750-seat performing arts center, which serves as a notable focal point and joins the student dining space. “This is one of the spaces that gets me really excited, especially when you are up on the stage looking out at all those chairs,” Scott said.

Lexington's 7-12 Performing Arts Center & Athletics Facilities

Dramatic Centralized Student Dining

An elongated student dining collaborative joins the northern high school portion to the southern junior high with a flooring material that transitions between the separate academic spaces. A view of the courtyard from this two-story area creates a dramatic visitor entrance.

Up to 400 students per lunch period are supported in this centralized space. It also serves as a lobby for the performing arts center and gymnasiums, allowing the school administrators to program the dining area to support different functions, creating greater flexibility. Lexington 7-12’s student dining was designed to create a logical buffer separating the academic-focused and public areas from each other.

While both academic wings are organized around collaborative spaces with media centers, the high school wing features a two-story open, collaborative space. Math and science are on the second floor, and English, world languages, and social studies are on the first.

Since opening in September 2022, the Lexington 7-12 school has established a modernized educational facility that supports the local community and its students.

Lexington's 7-12 Dining Area & Courtyard

Oberlin ES 2023 Healthy Buildings Winner Presentation

Oberlin ES 2023 Healthy Buildings Winner Presentation
Oberlin Elementary School has been honored as the Cleveland 2030 District's 2023 Healthy Buildings Winner. This recognition emphasizes the thought leadership of sustainable energy in educational design. Superintendent Dr. David Hall and ThenDesign Architecture Project Manager Brad Gellert shared their insights regarding the school's environmental achievements during the Healthy Buildings Winner Presentation.

Oberlin ES 2023 Healthy Buildings Winner Presentation

As a beacon of sustainable energy in educational design, Oberlin Elementary School has been honored as the Cleveland 2030 District’s 2023 Healthy Buildings Winner. This recognition emphasizes the unique and innovative sustainable energy practices of the project.

Oberlin City School District Superintendent Dr. David Hall and ThenDesign Architecture Project Manager Brad Gellert were invited to share their insights in a discussion about the school’s exceptional environmental achievements. The online presentation of the Building Education Series: Exemplary Renovation and New Construction Projects examined the philosophies and design practices that led to the school’s honorable recognition.

Dr. Hall explained the importance of environmental awareness as a driving force in the collaboration between the school district and the city, with sustainability initiatives being a priority for the local community. Brad Gellert gave an overview of the steps leading to the construction and completion of the project and highlighted the energy-saving features that illustrate the benefits of conscientious architecture.

"Sustainability in Oberlin is definitely a priority for the school and our community."
Dr. David Hall
Superintendent

Oberlin ES 2023 Healthy Buildings Winner Presentation

Exceptional Environmental Sustainability

Oberlin Elementary School is a collaborative project designed to continuously support the school district and surrounding community by incorporating environmental sustainability initiatives that can adapt to future needs. The project reflected the school’s International Baccalaureate curriculum and included several forward-thinking design elements.

One of the school’s stand-out features is a real-time environmental dashboard that monitors energy consumption so students can understand better how the building’s energy use affects the environment. This dashboard was funded by a grant from the Ohio Environmental Education Fund in partnership with Oberlin College.

Other sustainable initiatives offering firsthand learning opportunities include electric vehicle charging stations funded by grants from the Environmental Protection Agency and the implementation of a solar array supported by Oberlin College’s Green EDGE Fund, which provides about 79% of the building’s electrical needs.

Sustainability and collaborative learning are the hallmarks of this new educational facility and display how elementary schools can embody conservation principles.

Oberlin Elementary School in Action

Conscientious School Design

The 17.8 million dollar facility is a testament to the power of community collaboration, bringing together residents, staff, the city government, the Ohio Facilities Construction Commission, Oberlin College, Greenspace Construction Services, and ThenDesign Architecture.

The school boasts a STEAM (Science, Technology, Engineering, Arts, and Mathematics) Lab, an extended gymnasium space, open and flexible classrooms, advanced environmental controls, and an emotional sensory room, which sets it apart from traditional school designs.

Other low-cost sustainability measures included enhanced insulation in the building’s envelope, orienting the building so its longest side faces north, and adding larger windows to that façade. This minimizes heat gain and the need for increased cooling.

"Bringing daylight into the spaces connects to nature, making a much more pleasant environment for students."
Brad Gellert
Project Manager

Oberlin Elementary School Presentation Slides

Oberlin Elementary School's Innovative Features

Other Oberlin Elementary School environmental features include:

  • The new school’s location supports community density and development by utilizing an existing site.
  • Electric vehicle charging stations benefit staff, visitors, and local residents by supporting the city’s sustainability goal of becoming a net zero community.
  • Two solar energy installations comprised of a rooftop 12,000 kWh array and 335,000 kWh ground-mounted system provide approximately 79% of the school’s annual electricity needs.
  • To the greatest extent possible, recycled materials were utilized in building construction, and those materials were extracted and manufactured within 100 miles of the project site.
  • The indoor air quality of this building has been improved through the use of low-emitting materials that contain no or low amounts of volatile organic compounds (VOCs).

The commitment to sustainability and curricular integration of these elements makes Oberlin Elementary School a model for innovative school design.

“To create positive change in the world, you must work collaboratively with others,” said Brad Gellert. He added, “Spending years assisting the district with this project is personal. We are proud to be part of that collaboration and know they will enjoy the building for many years to come.”

If you would like to watch the entire Cleveland 2030 District presentation, click here.

The Campus of Wickliffe Receives an Outstanding Project Award

The Campus of Wickliffe Receives an Outstanding Project Award
The Campus of Wickliffe receives an Outstanding Project Award in the Spring 2024 Educational Facilities Design Awards Showcase by Learning By Design Magazine. The Wickliffe PK-12 Campus was designed to be forward-thinking, an educational facility designed for flexible learning. The Wickliffe design supported the district's goals by providing a flexible educational environment that encouraged learning and mentoring to contribute to the greater good.

The Campus of Wickliffe Receives an Outstanding Project Award

As a dedicated partner to Wickliffe City Schools, ThenDesign Architecture is thrilled to announce that The Campus of Wickliffe has been selected for an Outstanding Project Award by Learning by Design Magazine’s Spring 2024 Educational Facilities Design Awards Showcase. The Campus of Wickliffe has been recognized as a benchmark facility for incorporating next-generation learning space design and planning methodologies.

To view the publication award page, click on this link.

"This is not the work simply of the school staff or administration, but the work of an entire community. This is your work."
Joseph Spiccia
Superintendent, Wickliffe City Schools

The Campus of Wickliffe in Action

An Outstanding Achievement in Design

A jury of American Institute of Architects (AIA) members and education design professionals evaluated submissions nationwide from architectural firms, schools, and universities. The judges determine each project’s worthiness, unique qualities, and the architectural design and planning concepts that were successfully implemented.

The printed publications were recently distributed to over 50,000 subscribers within the education field throughout the United States, and spotlight the efforts of Wickliffe City Schools during this project.

A Journey of Dedication

A Catalyst for Change is Just the Beginning

As part of the “Catalyst for Change” initiative, the 204,000 SF Wickliffe PreK-12 Campus was designed to create flexible learning spaces for the Wickliffe City School District that could adapt to future educational needs. The new campus sits on the former high school site, reorganizes site circulation and reflects a mutual partnership with the community. A 500-seat Performing Arts Center, two full-sized gymnasiums, and a cafeteria are integrated into a main “Community Hub,” accessible for public events.

Career technical and STEM-focused spaces provide opportunities for students to explore a variety of academic and skills-based pursuits. Additionally, a new state-of-the-art stadium was completed adjacent to the school, becoming a new home for the Wickliffe Blue Devils.

The district participated in the Expedited Local Partnership Program (ELPP) through the Ohio Facilities Construction Commission (OFCC), and this $60 million project consolidates the aging elementary, middle, and high schools into a single PreK-12 building. In addition, the new facility hosts space for the Family Resource Center. This community center offers free services to many in need.

The new, two-story school officially opened at the beginning of the 2023-2024 school year.

"We are excited to see the extraordinary educational opportunities that will be afforded to our students now and into the future."
Carl Marine
President, Board of Education

The Campus of Wickliffe – Designed for Flexible Learning

Brunswick CSD’s Community Construction Update

Brunswick CSD's Community Construction Update
Community members gathered to participate in Brunswick CSD's Community Construction Update Meeting. Residents, students, and educators listened to a presentation by ThenDesign Architecture and Hammond Construction representatives to gain valuable insight into the status of the design and construction timeline for the new high school.

Brunswick CSD's Community Construction Update

On May 1, the Brunswick City School District hosted a highly successful Community Construction Update event, presenting the status of the design progress for the new high school. About 70 people, including students, educators, and local community members, attended the engagement to learn more details about the design and construction project.

Superintendent Jason Niedermeyer, ThenDesign Architecture, and Hammond Construction provided a comprehensive overview of the project’s current goals and accomplishments. They described the development site plan, including the school layout and a brief summary of the construction timeline.

Brunswick CSD's Community Construction Update

The Visual Preference Activity

Attendees were invited and encouraged to participate in a visual preference exercise. Several poster boards, each displaying two different aesthetic designs, were shown. They selected their preferences for the new high school by placing green stickers to designate their choice.

Their opinions about the future school’s exterior are invaluable, as they will shape the design and reflect the sensibilities of the Brunswick community. Continued public involvement is essential. Their feedback empowers them to influence the outcome directly.

Community Members Participate in the Update Meeting

Schematic Design Takes Shape

In an early April Community Construction Update meeting, ThenDesign Architecture presented the preliminary schematic design for the new Brunswick High School. The 302,000 SF school will contain academic space designed for 21st-century education, a 1,000-seat auditorium, and a competition gymnasium that holds 2,000 spectators.

“Tonight, we are really excited to share with you the journey we have been on and the process we have been through to create a building that this community can be proud of,” commented Superintendent Jason Niedermeyer.

The schematic design results from hundreds of hours working with BCSD staff, architects, engineers, and construction professionals. The interior layout is tailored to the district’s operations and how it can suit the needs of Brunswick City School students.

The building has three points of entry: the North, West, and South. Bus traffic will be routed to the west lot, with those students entering there, while visitors and parents can drop off students to the south, while the north lot will be used for students who drive. This lot will also be used as the event entry for the athletic and performance facilities.

The front of the building, which faces Center Road, is a two-story academic wing and is anchored by student services at its center. The compact nature of the structure allows students to travel more easily between classes and shared spaces. They will be taking advantage of this new modern educational environment, which is tailored to the needs of the district and the challenges they will face after high school.

The New Brunswick High School's Site Plans

New Brunswick High School Schematic Designs